* Scope of works - Installation of 750VA - 4kVA UPS
- Technician to unbox parts
- Power down existing UPS (if applicable)
- Remove UPS from Rack (if applicable)
- Install new UPS (Tower/Rack)
- Install any additional accessories, such as External battery packs, bypass switches.
- Connect equipment to UPS
- Turn on UPS and ensure UPS is supporting equipment.
- Removal (if requested) of UPS (750VA – 4kVA) and packaging.
** Does not include installation of mains electrical connection, assumes a sufficient mains electrical connection is available at the UPS point of installation. A sufficient electrical connection must be provisioned prior to the UPS installation.